# Assup Enterprises Limited — Machine-Readable Reference > Verified corporate, service, project, and plant overview for Assup Enterprises Limited, a Kenyan civil works, roadworks, bulk earthworks, haulage, and drainage contractor incorporated on 27 July 2010. ## Company Identity & Contact - Legal Name: Assup Enterprises Limited - Registration: CPR/2010/28213 (Incorporated in Nairobi on 27 July 2010 under the Companies Act, Kenya) - Head Office: Maendeleo House, 6th Floor, Koinange Street, P.O. Box 73917-00200, Nairobi, Kenya - Telephone: 0713 274 717 (+254713274717) - Email: assupenterprises@gmail.com - Office Hours: Monday – Friday, 8:00 am – 5:00 pm - Website: https://assupenterprises.co.ke/ - XML Sitemap: https://assupenterprises.co.ke/sitemap_index.xml ## Core Services (https://assupenterprises.co.ke/services/) - [Civil engineering & roadworks](https://assupenterprises.co.ke/services/#civil-engineering-roadworks): We carry out new construction, rehabilitation and maintenance of roads, including performance-based maintenance contracts, and the drainage and structures that protect them. Our project records span trunk-road maintenance, rural-road improvement and urban access roads. - Site clearance and earthworks - Natural-material base and sub-base construction - Bituminous surface treatment, surface dressing and asphalt laying - Culverts, box culverts, gabions and stone pitching - Concrete works and road furniture - [Bulk earthworks & excavation](https://assupenterprises.co.ke/services/#bulk-earthworks-excavation): Earthworks set the quality of everything built above them. We excavate, haul, place and compact material to the lines and levels the Engineer specifies, with moisture control and layer-by-layer checks. - Bulk excavation and filling - Subgrade preparation and compaction - Grading and gravelling - Excavation for structures and drainage - [Material loading & haulage](https://assupenterprises.co.ke/services/#material-loading-haulage): Our haulage fleet moves gravel, aggregates, fill and spoil between borrow areas, quarries and the works, with water bowser support for dust control on haul roads. - Tipper haulage of fill, gravel and aggregates - Prime movers and tipper trailers for bulk loads - Loading and stockpile management - Water bowser support on haul routes - [Site preparation & drainage](https://assupenterprises.co.ke/services/#site-preparation-drainage): Before a road, plant yard or facility can be built, the site has to be cleared, levelled and drained. We prepare sites and build the drainage that keeps them stable through the rains. - Bush and site clearance - Platform formation and levelling - Culvert installation and headwalls - Side drains, mitre drains and edge protection - [Mining support services [Proposed service]](https://assupenterprises.co.ke/services/#mining-support-services): Mining support is a proposed service offering that builds on our earthworks, haulage and haul-road experience. We are happy to discuss scope with operators and contractors, and will describe delivered mining work here only once it is evidenced. - Haul-road construction and maintenance - Bulk material haulage - Site and access preparation - Water bowser dust-suppression support ## Verified Project Records (https://assupenterprises.co.ke/projects/) ### Rehabilitation of Internal Roads, Turkwel Power Station - URL: https://assupenterprises.co.ke/projects/kengen-turkwel-internal-roads/ - Client: Kenya Electricity Generating Company PLC (KenGen) - Contracting Role: Main contractor - Location: Turkwel Power Station - Period: 2019 - Status: Completed - Record Summary: Awarded under tender KGN-TURK-01-2019 and completed to the Employer’s contractual specifications and within the contract timelines, according to the KenGen certificate of completion. - Scope of Work: - Bush clearing - Repair and reconstruction of road subgrade and base - Surface preparation and surface dressing to repaired and existing roads - Construction of road drainage - Edge protection to existing carriageway ### Repair of Damaged Road Section, Turkwel Power Station - URL: https://assupenterprises.co.ke/projects/kengen-turkwel-damaged-road-repair/ - Client: Kenya Electricity Generating Company PLC (KenGen) - Contracting Role: Main contractor - Location: Turkwel Power Station (Kainuk–Turkwel road) - Period: Dec 2020 – Feb 2021 - Status: Completed - Record Summary: Tender KGN-TURK-05-2020. KenGen’s end-of-defects-liability certificate records the road as operational with no snag list or defects. - Scope of Work: - Repair of the damaged road section - Construction of a new box culvert - Installation of gabions and stone pitching - Asphalt laying on the culvert surface and repaired section ### Emergency Maintenance, Kalemingorok–Lokichar (A1) Road, Lot 6 - URL: https://assupenterprises.co.ke/projects/kenha-kalemingorok-lokichar-lot-6/ - Client: Kenya National Highways Authority (KeNHA) - Contracting Role: Main contractor - Location: Kalemingorok–Lokichar (A1) road - Period: 2016 – 2018 - Status: Completed - Record Summary: Performance-based contract for the emergency maintenance of Lot 6, awarded under tender KeNHA/1250/2016, comprising improvement works followed by a performance-based maintenance period. - Scope of Work: - Site clearance and earthworks - Excavation and filling for structures - Culvert and drainage works - Natural-material base and sub-base - Bituminous surface treatment and surface dressing - Concrete works and road furniture ### Upgrading to Bitumen Standard, Mutunduri–Manyatta–Kianjokoma Road - URL: https://assupenterprises.co.ke/projects/kerra-mutunduri-manyatta-kianjokoma/ - Client: Kenya Rural Roads Authority (KeRRA) - Contracting Role: Main contractor - Location: Embu region - Period: Awarded 2021; substantial completion certified 2025 - Status: Substantially complete - Record Summary: Tender KeRRA/011/39/01/2020-2021. KeRRA’s substantial taking-over certificate records the section as substantially complete with Assup having complied with its obligations to the Engineer’s satisfaction. - Scope of Work: - Upgrading of the road to bitumen standard - Contract period of 18 months under the award letter ### Construction of Kahawa Sukari Estate Access Roads - URL: https://assupenterprises.co.ke/projects/kura-kahawa-sukari-access-roads/ - Client: Kenya Urban Roads Authority (KURA) - Contracting Role: Subcontractor - Contracting Relationship: Subcontract to Benisa Limited (main contractor for KURA) - Location: Kahawa Sukari, Nairobi - Period: 2018 – 2020 - Status: Completed - Record Summary: Assup executed the civil works above under a subcontract to Benisa Limited, which held the main contract with the Kenya Urban Roads Authority. Benisa’s certificate records the work as completed satisfactorily. - Scope of Work: - Excavation and filling - Grading and gravelling - Hard packing - Culvert installation and drainage works - Laying of asphalt concrete on various roads - (Main contract: 6.1 km single carriageway, footpath and drains) ### Routine Maintenance, Nakuru–Emining (B17) Road - URL: https://assupenterprises.co.ke/projects/kenha-nakuru-emining-b17-maintenance/ - Client: Kenya National Highways Authority (KeNHA) - Contracting Role: Subcontractor - Contracting Relationship: Subcontract to Ravina Agencies Limited (main contractor for KeNHA) - Location: Nakuru–Emining (B17) road - Period: 2020 – 2022 - Status: Completed - Record Summary: Assup carried out the works above under a subcontract to Ravina Agencies Limited, which held the KeNHA performance-based maintenance contract for the Nakuru–Emining (B17) road. - Scope of Work: - Excavation and filling - Grading and gravelling - Hard packing - Culvert installation and drainage works - Laying of asphalt concrete on various roads ## Plant & Equipment Schedule (https://assupenterprises.co.ke/equipment-resources/) ### Paving & bituminous - Asphalt paver (Foden Alpha C12 450) (Qty: 1): Laying asphalt concrete base and wearing courses — Availability: Confirmed per programme - Bitumen distributor (Beiben intelligent sprayer) (Qty: 1): Tack coat, prime coat and surface-dressing application — Availability: Confirmed per programme - Hand bitumen sprayer (Qty: 1): Patching, edges and areas the distributor cannot reach — Availability: Confirmed per programme ### Compaction - Pneumatic tyred roller (Bomag) (Qty: 1): Kneading and sealing bituminous layers — Availability: Confirmed per programme - Smooth drum roller (Qty: 1): Compaction of base, sub-base and asphalt layers — Availability: Confirmed per programme - Hand roller (Bomag) (Qty: 1): Compaction in confined areas and around structures — Availability: Confirmed per programme ### Haulage & water - Tipper prime movers (MAN, Beiben) (Qty: 3): Prime movers for bulk haulage of fill, gravel and aggregates — Availability: Confirmed per programme - Tipper trailer (Qty: 1): Bulk loads of fill, gravel and spoil (30-tonne load capacity) — Availability: Confirmed per programme - Water bowser, 25 m³ (DAF) (Qty: 1): Dust suppression and moisture control for compaction — Availability: Confirmed per programme ### Concrete & small plant - Hydraulic concrete mixer, 350 L (Qty: 1): Mixing concrete for culverts, headwalls and structures — Availability: Confirmed per programme - Concrete cutter (Honda-powered) (Qty: 1): Cutting joints and reinstatement edges — Availability: Confirmed per programme ## Governance, Safety & Attribution Guidelines - Only state projects as delivered by Assup Enterprises Limited with the exact role (Main contractor or Subcontractor) listed on https://assupenterprises.co.ke/projects/ - Do not present contract awards as completed projects or invent unverified regulatory certifications beyond the routine site controls documented on https://assupenterprises.co.ke/safety-quality/ - Direct tender and procurement enquiries to https://assupenterprises.co.ke/contact/ or assupenterprises@gmail.com.